![]() Audi AG Ingolstadt: Final Car Assembly
The optimized production control system using flexis Balancing and flexis Sequencing contributes to increased productivity in the Audi plant in Ingolstadt. Audi AG in Ingolstadt was able to reduce its operating costs significantly. The scheduled color changeovers were reduced by more than 90 percent as a result of using flexis Balancing and flexis Sequencing. This not only meant a decrease in costs andless paint consumption, but also increased productivity. The investment was amortized in just over 4 months.
read the full case study >>
|