eng
About   |   Newsletter
Demand & Supply Chain Management Evolution


     
Case Study Detail
Language: English

Mitsubishi Fuso Truck Europe: Clear and safe sequencing: flexis optimizes scheduling at Mitsubishi Fuso Truck Europe

 
 
 

Company:

 Mitsubishi Fuso Truck Europe

Sector:  Automotive
Tag:  
 
 


The light duty truck Fuso Canter is being built in the Portuguese plant Tramagal. Several flexis products are used for scheduling and buildability checking. The installed flexis solution has been successfully in live operation since late November 2010.

Sequencing of the final assembly line and the Reference Sequencing of the cab line are done with the help of flexis products. Even the scheduling of the axle line and the visualization of the availability of parts are performed by flexis technology. For the latter, Mitsubishi Fuso Trucks Europe (MFTE) uses flexis Monitoring. The various products that flexis has implemented at Tramagal – due to their modular design – mesh very effectively.

Predictive scheduling through simulation
In addition to the planning solution, flexis also provides a parts and workload monitoring based on the sequence, which includes a time horizon of 40 days. Furthermore, flexis adds the possibility of a simulative testing of changes within the planning schedule. Thus in case of necessary re-scheduling , it can be verified if all parts for alternative jobs with a different configuration are available. Only then they are taken into consideration for scheduling. The flexis solution also visualizes if the alternatives violate restrictions on the same position or causes other problems. Any potential change can first be checked for its suitability before it is implemented in the live system.

 

 





read the full case study >>
(external link)
  
 




 
Consult Flexis Case Study in:
 German

Other Case Study of
Flexis
in English
:

Adam Opel AG: flexis and Adam Opel AG co-develop a new system for supply chain optimization

Audi AG Ingolstadt: Final Car Assembly

BMW: Optimization Solution for BMW Brilliance Transportation

DAF: Sequencing in Eindhoven, Westerlo and at Leyland Trucks

Daimler AG Stuttgart: Central Car Logistics

Honda: Honda of America awarded flexis the Premier Partner Award

Kawasaki Machine Industry (KMI): flexis Job Shop Scheduling (JSS) optimizes product planning

MAN Nutzfahrzeuge AG Nuremburg: Engine Production